Why it's on you
Building and Energy, the state regulator, says owners must make sure a building permit is obtained from council before work starts, and penalties apply if it isn't. So even when a builder says "we look after the permit", it pays to check.
Patios (roofed outdoor areas) are Class 10a buildings. Most need a building permit, unless they're freestanding, 10 m² or less and 2.4 m or lower.
Six checks before you sign
- Is the permit in the quote? Look for a line that says the builder prepares the drawings, engineering and building permit application, and pays the council fees. If it isn't written down, assume it isn't included.
- Who is the applicant? Ask whose name goes on the application. Every owner on the title still has to sign the BA2 form.
- Is planning approval covered? If your patio is in the front yard, on a heritage property or doesn't meet the setbacks, it may need planning approval first. Ask if the builder handles that too.
- Is there a written contract? For home building work between $7,500 and $500,000, the Home Building Contracts Act applies whether or not the builder is registered. Contracts must be in writing and signed by both of you, and the builder must give you the "Notice for the homeowner".
- Is the deposit 6.5% or less? That's the most a builder can ask for before work starts on these contracts. Progress payments should only cover work done or materials delivered.
- Over $20,000? Home indemnity insurance is required for work that needs a building permit and is worth more than $20,000. Ask for the certificate and check it on QBE's online register before you pay anything.
Do they need to be a registered builder?
Since 1 July 2026, a patio worth less than $50,000 doesn't have to be built by a registered builder. Patios worth more do. You can check a builder's registration with the state's Find a registered builder search.
Before work starts
- Ask for a copy of the building permit. Don't let work start without it.
- Check the plans on the permit match what you're getting (size, height and position).
- Within 7 days of finishing, a notice of completion (BA7) goes to council. Ask who lodges it.